Your budget. Your priorities.
A renovation you like. A budget you keep.
Compare your material quotes as part of the whole project. Tell us how much aesthetics, durability and ease of maintenance matter to you, then see which entered options fit both your preferences and your hard budget.
Fictional examples, not retail prices or product ratings. The $30,000 budget, quotes and scores below illustrate the calculation only. Replace every relevant input with your own numbers. No prices, material lifespan, availability, suitability or contractor quality have been verified.
Your quote-based comparison
Totals cover entered costs only; missing project costs are not estimated. Preference fit is not objective product quality, safety or suitability. Only in-budget options receive a preference rank. A higher score cannot override your cap. Ties stay tied; cost is not a hidden tie-breaker.
| Cost or score | A | B | C |
|---|
What to check next
Cheaper entered alternatives to consider
You can request a lower quote for the same scope or intentionally revise a comparison option to test a different scope or finish. Update the actual quantities, labor, removal, taxes and other costs together. No replacement quote or savings are invented here.
No new purchase is a valid route
Pause new purchases while you gather comparable quotes, or keep the existing finish if you judge that appropriate. This tool does not inspect the condition of your home or determine whether work is necessary. Delaying a purchase does not erase contracts, safety issues or existing costs.
This calculator processes your inputs in the browser without saving them or adding them to the URL. CSV downloads contain your entered labels and numbers; keep them private if needed. Other website resources follow our privacy notice.
Before relying on a quote
- Confirm the exact product, finish, quantities, unit, included scope, quote date, expiration, delivery and installation assumptions directly with its source.
- Confirm what labor, preparation, removal, disposal, taxes, fees and other project costs are included. An unknown cost is not zero; replace placeholders before deciding.
- Keep your product claims and scores separate: the scores express your preference, not a verified specification, lifespan or warranty outcome.
- Verify intended-use suitability and any applicable project requirements separately. This calculator does not assess structural, electrical, fire, moisture or other building safety, codes, permits, installation quality or contractor credentials.
- Review payment, deposit, change-order, return and cancellation terms before committing. An affordable calculation does not validate a quote or promise a final project price.
No retailer or contractor is ranked or endorsed. There are no purchase or affiliate links in this calculator. You may obtain quotes from sources of your choice; no account, upload or purchase is required.
How the comparison works
Materials = total quantity × unit price, rounded once to the nearest cent. Quote subtotal = materials + labor + removal / disposal + delivery / extras + the entered tax amount. Project base subtotal = quote subtotal + other project costs. Contingency = project base subtotal × your selected percentage, rounded to the nearest cent. All-in total = project base subtotal + contingency. Headroom = hard budget − all-in total. Half-cent ties round upward.
Preference fit /10 = (aesthetics score × aesthetics importance + durability score × durability importance + ease-of-maintenance score × maintenance importance) ÷ sum of importance weights. Scores and importance weights are whole numbers from 0 to 10. Results show two decimals, but rankings and ties use the unrounded weighted numerator. Affordable ranks use competition ranking: a tie for rank 1 is followed by rank 3. With all weights zero, scores and preference ranks are unavailable; cost totals still work.
Quotes over the cap are excluded from affordable ranking, even if they have the highest preference fit. Relative weights are not minimum quality thresholds. You can change both your importance weights and your own quote-specific scores; the ranking and next steps update. Importance of 7 or higher prompts a relevant verification reminder, not a product standard.
Money, quantities and contingency accept up to two decimal places. Quantity is limited to 100,000; each money input other than the hard cap is limited to $1 million; the hard cap to $100 million; contingency to 0–100%. These are software limits, not suggested spending. Zero quantity produces zero material cost, not necessarily zero project cost. All inputs must use one currency; no exchange conversion or price feed is provided.
The result only covers the costs you enter. No material-price database, predicted lifespan, resale return, suitability assessment, contractor recommendation, financing recommendation or claim of being the first or only such tool is provided. Methodology reviewed October 25, 2026. Your information. Your decision.